Renovation Electrical Toronto

Toronto · Renovation Electrical

Renovation Electrician in Toronto

Renovation and addition wiring across Toronto — kitchens, basements, multiplex conversions and garden suites, planned with your designer from the start.

ECRA/ESA Licence #7014949$5M Liability InsuredWSIB Covered5.0★ · 50+ Google Reviews

Renovation Electrical in Toronto

Toronto renovations rarely stay small. A kitchen becomes a main-floor opening, a basement becomes a second unit, and since 2023 a detached house can become a multiplex of up to four units. Each of those changes what the electrical service has to carry, so the electrical belongs at the design table rather than after the drywall order.

Kitchens and main floors

Circuits, lighting and appliance loads planned around the new layout.

Multiplex conversions

Separate services or metering for up to four units, sized properly.

Garden and laneway suites

Feeds to rear-lot suites, coordinated with Toronto Hydro.

Full gut renovations

Rewiring the whole house while the walls are already open.

Licensed electrician wiring an open service panel during a rough-in with floor joists exposed
In at design stageService, panel and circuits decided before the drawings are final.

What Toronto Renovations Need From the Electrical

Three renovation types drive most of our Toronto project work.

Renovated kitchen with a recessed pot light layout and a pendant over the island
Toronto: what we actually findA City of Toronto building permit and an ESA notification are separate. The building permit does not cover the electrical — we file the ESA side for every job.

Multiplex conversions

Toronto now permits up to four units on most residential lots. Every unit needs its own capacity, and the service and metering arrangement has to be decided before the layout is final — Toronto Hydro lead times can set the whole schedule.

Garden and laneway suites

A suite at the back of the lot needs a feed from the house or its own service. Distance, trenching and the house's spare capacity decide which, and it is worth knowing early.

The gut renovation

When plaster comes off an older Toronto house, rewiring costs a fraction of what it does later. Most of our full rewires happen inside a renovation for exactly that reason.

Open-plan kitchen with a recessed pot light layout and a flush-mount ceiling fixture

How a Toronto Renovation Runs

01

Design stage

Load calculation, service decision and circuit plan with your designer.

02

Rough-in

Wiring installed and inspected by the ESA before walls close.

03

Finish and final

Devices, fixtures and the ESA final, coordinated with your contractor.

Toronto Neighbourhoods We Serve

We work right across Toronto. If your street is not listed it almost certainly still counts — see renovation electrical in full, or our Toronto electricians page.

RosedaleForest HillLawrence ParkThe AnnexYorkvilleSummerhillLeasideThe BeachesRiverdaleLeslievilleHigh ParkRoncesvallesBloor West VillageKing WestYonge & EglintonCasa Loma

Toronto Renovation Electrical FAQs

Can my Toronto house become a multiplex?

Most residential lots in Toronto now permit up to four units as-of-right, subject to zoning and building code requirements. The electrical question is capacity and metering for each unit, which we plan with your designer.

When should the electrician be involved in a renovation?

At design stage. Service size, panel location and circuit layout affect the drawings, and Toronto Hydro lead times for service changes can affect the schedule.

Does my building permit cover the electrical?

No. A City of Toronto building permit and the ESA notification are separate. We file the ESA notification and arrange its inspections.

Can you work with my general contractor?

Yes — most of our renovation work is coordinated with a GC or designer. We work to their schedule and keep the site clean.

Should I rewire while I renovate?

If the house has original wiring, usually yes. With walls open, rewiring costs a fraction of what it does later and saves reopening finished rooms.

Planning a Toronto renovation?

Get the electrical into the design — before the drawings are final.